The details of installed capacity (de-rated) of thermal power stations under UPRVUNL on 31.03.2014 are as follows :-

 

POWER STATIONS

De-rated Installed Capacity 
in MW as on 31.03.2013

De-rated Installed Capacity 
in MW as on 31.03.2014

1.

Obra

1288 (=2x50+2x94*+5x200)

1288 (=2x50+2x94+5x200)

2.

Panki

210 (=2x105)

210   (=2x105)

3.

Harduaganj

415 (=1x60+1x105+1x250)

665   (=1x60+1x105+2x250)

4..

Parichha

890  (2x110+2x210+1x250)

1140 (2x110+2x210+2x250**)

5..

Anpara

1630 (=3x210+2x500)

1630 (=3x210+2x500)

 

Total

4433

4933

Note:-
1.  Unit no. 6 of Parichha TPP- 250 MW** has been taken on commercial load w.e.f. 18.04.2013.

 

 The power station wise generation details for F.Y. 2012-13 & F.Y. 2013-14 are given as below:

Name of the Hydro Electric Power Stations

Installed Capacity

Gross Generation (M.U.)

 

 

F.Y. 2012-13

F.Y.2013-14

Rihand

300 MW

771.28

503.99

Obra(H)          

99 MW

313.72

203.13

Matatila         

30.6 MW

118.27

115.97

Khara  

72 MW

375.12

418.43

SHPs on Upper Ganga Canal

15.5 MW

21.16

19.35

SHPs on East Yamuna Canal  

6 MW

5.50

5.73

Sheetla SHP                

3.6 MW

2.36

1.64

Total   

526.7 MW

1607.41

1268.23

 

Existing Transmission Network 

Voltage

Lines (Ckt.)
(as on 31-6-2013)

Sub-stations (No./MVA)
(as on 31-6-2013)

765 KV

410.93

1/2000

400 KV

4259.415

14/9010

220 KV

8118.323

73/22630

132 KV

13940.778

276/27271

 

Sourcewise Installed Generating Capacity (MW)

 

Status & Trends  Sourcewise Installed Generating Capacity (MW)

Year

Thermal

Hydro(including Misc.Hydel)

Total(2 +3)

UP's Share in Central Power Projects

Total(4 +5)

1

2

3

4

5

6

1984-85

2714.00

1430.10

4144.10

350.00

4494.10

1990-91

3554.00

1432.75

4986.75

1632.00

7038.75

1995-96

4544.00

1504.75

6048.75

2433.00

8481.75

2001-02

3909.00

515.00

4424.00

2944.00

7368.00


(*Data for 84-85, 90-91 and 95-96 include Uttaranchal)



Demand and Availability of Energy

Year

Peak Demand availability (MW)

Energy Demand availability (mkwh)

 

Peak
Demand

Availability

Shortage

Demand

Availability

Shortage

1997-1998
(Actual)

6578

5395

17.98

42761

36171

15.41

1999-2000
(Actual)

6945

5967

17.97

48192

39864

17.28

2000-2001

7435

5840

21.45

48587

41988

13.58

 


Transmission/Distribution Losses, Per Captia Energy Consumption Generation and PLF
 

 

Line

1980-81*

1990-91*

1999-2000*

2001-02

1.

Line Losses (%)

15.46

26.08

40.61

36.56

2.

Per Capita Consumption

87.00

168.00

176.90

191.00

3.

Generalion (Mkwh)

NA

14284

18960

18301

4.

PLF (%)(Thermal Stns)

 

52.1

49.14(1998-99)

59.8

 


Categorywise Electricity Consumption (% age)


 

Year

Electrified(By Villages (Per CEA definition

LT mains

Schedule Caste Bastis (Electrified)

Private TubeWells Electrified

*

1980-81

42372

19025

16277

383949

*

1990-91

82603

49600

50517

624376

 

2001-02

76641

54951

59483

787552

 

2003-04

 

57115

61750

806772


Note:   Effective villages electrification is yet to be done in over 40000 villages.