Database
The power station wise generation details for F.Y. 2012-13 & F.Y. 2013-14 are given as below:
|
POWER STATIONS
|
De-rated Installed Capacity
in MW as on 31.03.2013
|
De-rated Installed Capacity
in MW as on 31.03.2014
|
1.
|
Obra
|
1288 (=2x50+2x94*+5x200)
|
1288 (=2x50+2x94+5x200)
|
2.
|
Panki
|
210 (=2x105)
|
210 (=2x105)
|
3.
|
Harduaganj
|
415 (=1x60+1x105+1x250)
|
665 (=1x60+1x105+2x250)
|
4..
|
Parichha
|
890 (2x110+2x210+1x250)
|
1140 (2x110+2x210+2x250**)
|
5..
|
Anpara
|
1630 (=3x210+2x500)
|
1630 (=3x210+2x500)
|
|
Total
|
4433
|
4933
|
Note:- 1. Unit no. 6 of Parichha TPP- 250 MW** has been taken on commercial load w.e.f. 18.04.2013.
The power station wise generation details for F.Y. 2012-13 & F.Y. 2013-14 are given as below:
Name of the Hydro Electric Power Stations
|
Installed Capacity
|
Gross Generation (M.U.)
|
|
|
F.Y. 2012-13
|
F.Y.2013-14
|
Rihand
|
300 MW
|
771.28
|
503.99
|
Obra(H)
|
99 MW
|
313.72
|
203.13
|
Matatila
|
30.6 MW
|
118.27
|
115.97
|
Khara
|
72 MW
|
375.12
|
418.43
|
SHPs on Upper Ganga Canal
|
15.5 MW
|
21.16
|
19.35
|
SHPs on East Yamuna Canal
|
6 MW
|
5.50
|
5.73
|
Sheetla SHP
|
3.6 MW
|
2.36
|
1.64
|
Total
|
526.7 MW
|
1607.41
|
1268.23
|
Existing Transmission Network
Voltage
|
Lines (Ckt.)
(as on 31-6-2013)
|
Sub-stations (No./MVA)
(as on 31-6-2013)
|
765 KV
|
410.93
|
1/2000
|
400 KV
|
4259.415
|
14/9010
|
220 KV
|
8118.323
|
73/22630
|
132 KV
|
13940.778
|
276/27271
|
Source: Planning Department, U.P. (as per Annual Plan- 2014-15)
Sourcewise Installed Generating Capacity (MW)
Year
|
Thermal
|
Hydro (including Misc.Hydel)
|
Total (2 +3)
|
UP’s Share in Central Power Projects
|
Total(4 +5)
|
1
|
2
|
3
|
4
|
5
|
6
|
1984-85
|
2714.00
|
1430.10
|
4144.10
|
350.00
|
4494.10
|
1990-91
|
3554.00
|
1432.75
|
4986.75
|
1632.00
|
7038.75
|
1995-96
|
4544.00
|
1504.75
|
6048.75
|
2433.00
|
8481.75
|
2001-02
|
3909.00
|
515.00
|
4424.00
|
2944.00
|
7368.00
|
(*Data for 84-85, 90-91 and 95-96 include Uttaranchal)
Source: http://planning.up.nic.in
Demand and Availability of Energy
Year
|
Peak Demand & availability (MW)
|
Energy Demand availability (mkwh)
|
|
Peak Demand
|
Availability
|
Shortage
|
Demand
|
Availability
|
Shortage
|
1997-1998
(Actual)
|
6578
|
5395
|
17.98
|
42761
|
36171
|
15.41
|
1999-2000
(Actual)
|
6945
|
5967
|
17.97
|
48192
|
39864
|
17.28
|
2000-2001
|
7435
|
5840
|
21.45
|
48587
|
41988
|
13.58
|
Source : http://planning.up.nic.in
Transmission/Distribution Losses, Per Captia Energy Consumption Generation and PLF
|
Line
|
1980-81*
|
1990-91*
|
1999-2000*
|
2001-02
|
1.
|
Line Losses (%)
|
15.46
|
26.08
|
40.61
|
36.56
|
2.
|
Per Capita Consumption
|
87.00
|
168.00
|
176.90
|
191.00
|
3.
|
Generalion (Mkwh)
|
NA
|
14284
|
18960
|
18301
|
4.
|
PLF (%)(Thermal Stns)
|
NA
|
52.1
|
49.14(1998-99)
|
59.8
|
*Categorywise Electricity Consumption (% age)
Source : http://planning.up.nic.in